River Weaver Trip
After finishing work earlier than usual at 2.30PM, I headed straight over to the moorings and after packing my gear away and checking things over I set off at about 3.30PM. By 8PM I had made Moore, where I stopped for the night having breifly tied in Lymm Village for a few provisions.

On Saturday morning I was up by 4AM and set off at around 4.30AM, making Anderton for around 7.30AM where I tied on the Lift Holding Moorings. Kerry joined me at around 9.30AM, and as planned at 10.30AM we were heading down the lift onto the River Weaver.


Firstly We turned right from Anderton and headed down to Saltesford, where we winded above the lock, heading back to Northwich before winding below Vale Royal Lock. A short stop in Northwich for a bite to eat was planned for, before heading back towards Vale Royal where we tied up in Yarwoods Basin.